Residential Compound
02 Selected work

Residential Compound

Al-Qassim
Project data
LocationAl-Qassim Region
ScopeFinishing works
Units16 villas · 12 townhouses · 44 apartments
Total72 residential units
Scope of works
Sandstone finishing to apartment façades
Installation of perforated metal screens
Finishing to villa and townhouse façades
Render and stonework
Metal gates and metalwork
Interlock paving and bay numbering
Pavements and walkways
Planting and landscaped beds

Finishing works for an integrated residential compound of seventy-two units across three housing types, executed with a unified façade treatment that gives the development a single visual identity while keeping each type distinct. The three-storey apartment block is clad in sandstone with dark perforated metal screens that modulate the vertical openings and control light and privacy. Villas and townhouses combine stone and render with black metal gates and matching metalwork. Site works complete the scheme: numbered interlock parking, pavements and walkways, planting and landscaped beds between the residential blocks.

Finishing

16
Apartment block — sandstone and screens
Apartment block — sandstone and screens
Side elevation of the apartment block
Side elevation of the apartment block
Villa entrance and black metal gate
Villa entrance and black metal gate
Villa façade with stone arch
Villa façade with stone arch
Numbered interlock parking
Numbered interlock parking
Blind elevation and perforated screen
Blind elevation and perforated screen
Aerial — residential block and street
Aerial — residential block and street
Aerial — extent of the villa rows
Aerial — extent of the villa rows
Aerial view from the north
Aerial view from the north
Aerial — townhouses and apartments
Aerial — townhouses and apartments
Apartment block — rear elevation
Apartment block — rear elevation
Villa row and entrances
Villa row and entrances
Townhouse frontage along the street
Townhouse frontage along the street
Entrance canopy and marked parking
Entrance canopy and marked parking
Longitudinal elevation of the compound
Longitudinal elevation of the compound
The compound after handover
The compound after handover